ISLUS installed in Sydney Eastern Distributor Tunnel
Armitage Group designed and installed the very first Integrated Speed Land Use Signs (ISLUS) in the Eastern Distributor Tunnel in 2015. Eastern Distributor is a key link and consists of a 6 km motorway and features a 1.7 km ‘double deck’ tunnel. The use of this tunnel bypasses up to 17 Traffic lights and improved […]